Factory Extension and Modifications, EC Copeland Ltd

This project was carried out in three phases;

Phase 1:
The construction of a new reinforced concrete bund to facilitate the installation of a new process oil tank and delivery pipework.

Phase 2:
The construction of a new steel clad skip building on a reinforced concrete base with integral ramps and sumps to aid the loading and unloading of skips.

Phase 3:
The renovation and refurbishment of the existing skip area to provide more factory, storage and office floor space within the existing facility.  The works included the creation of a high level floor with specialist finishes, reinforced concrete access ramps, new access doors and platforms and refurbishment of the existing perimeter walls.

All works were successfully carried out to ensure no interruption was caused to normal daily activities within the factory.

The project was completed on budget and time and as a result further contracts have been secured.