Creagh Concrete, Aldi- Naas

For this project Creagh Concrete and OBConstruction were appointed to carry out the construction of the main structure of the distribution centre.  The scope of works included:


Construction of Perimeter walling.

Installation of precast dock levelling components.

Structural floors.

 

This project was carried out maximising the use of off site construction techniques to deliver the building within an accelerated timeframe whilst maintaining budget.